The 2012 Chip Seal contract
is complete.
Crews will be applying a coating over the next few
weeks to seal the surface, after the newly chipped raods have had a chance to cure and
have been swept.Please obey the posted temporary speed limits to avoid vehicle damage and
minimize flying rock chips until the sealant coat is applied and
the temporary speed signs are removed.